{"id":6577,"date":"2023-03-16T14:00:04","date_gmt":"2023-03-16T17:00:04","guid":{"rendered":"http:\/\/ri.taesa.com.br\/?page_id=6577"},"modified":"2025-11-13T09:58:30","modified_gmt":"2025-11-13T12:58:30","slug":"new-transmission-business","status":"publish","type":"page","link":"https:\/\/ri.taesa.com.br\/en\/financial-information\/new-transmission-business\/","title":{"rendered":"New Businesses in Transmission"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_row css=&#8221;.vc_custom_1548956217993{margin-bottom: 20px !important;}&#8221; el_id=&#8221;nomobile&#8221;][vc_column offset=&#8221;vc_hidden-sm vc_hidden-xs&#8221;]\n\t\t\t<!-- START Novos Neg\u00f3cios REVOLUTION SLIDER 6.6.15 --><p class=\"rs-p-wp-fix\"><\/p>\n\t\t\t<rs-module-wrap id=\"rev_slider_49_1_wrapper\" data-source=\"gallery\" style=\"visibility:hidden;background:transparent;padding:0;margin:0px auto;margin-top:0;margin-bottom:0;\">\n\t\t\t\t<rs-module id=\"rev_slider_49_1\" style=\"\" data-version=\"6.6.15\">\n\t\t\t\t\t<rs-slides style=\"overflow: hidden; position: absolute;\">\n\t\t\t\t\t\t<rs-slide style=\"position: absolute;\" data-key=\"rs-49\" data-title=\"Slide\" data-anim=\"adpr:false;\">\n\t\t\t\t\t\t\t<img decoding=\"async\" src=\"\/\/ri.taesa.com.br\/wp-content\/plugins\/revslider\/public\/assets\/assets\/dummy.png\" alt=\"\" title=\"New Businesses in Transmission\" class=\"rev-slidebg tp-rs-img rs-lazyload\" data-lazyload=\"\/\/ri.taesa.com.br\/wp-content\/uploads\/2018\/11\/Novos-Neg\u00f3cios.jpg\" data-no-retina>\n<!---->\t\t\t\t\t\t<\/rs-slide>\n\t\t\t\t\t<\/rs-slides>\n\t\t\t\t<\/rs-module>\n\t\t\t\t<script>\n\t\t\t\t\tsetREVStartSize({c: 'rev_slider_49_1',rl:[1240,1024,778,480],el:[],gw:[1366],gh:[300],type:'standard',justify:'',layout:'fullwidth',mh:\"0\"});if (window.RS_MODULES!==undefined && window.RS_MODULES.modules!==undefined && window.RS_MODULES.modules[\"revslider491\"]!==undefined) {window.RS_MODULES.modules[\"revslider491\"].once = false;window.revapi49 = undefined;if (window.RS_MODULES.checkMinimal!==undefined) window.RS_MODULES.checkMinimal()}\n\t\t\t\t<\/script>\n\t\t\t<\/rs-module-wrap>\n\t\t\t<!-- END REVOLUTION SLIDER -->\n[\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1558980062558{margin-bottom: 20px !important;}&#8221;][vc_column][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4><strong>Greenfield<\/strong><\/h4>\n<p>The Company currently has four projects under implementation with a total ANEEL investment of R$ 4.3 billion and an RAP of R$ 490.7 MM (RAP cycle 2025-2026) \u2013 part of this RAP is already in operation (R$ 137.5 MM of Sa\u00edra) \u2013 and six large-scale reinforcements with a total ANEEL investment of R$ 393.9 MM and an authorized RAP of R$ 71.5 MM.[\/vc_column_text]<div class=\"table-responsive\">\n    <table id=\"transmissao\" class=\"table table-borderless table-acc\">\n        <thead>\n        <tr>\n\t\t\t                <th scope=\"col\">&nbsp;<\/th>\n\t\t\t\t\t\t<th scope=\"col\">Project <\/th><th scope=\"col\">Auction<\/th><th scope=\"col\">Extension\/Location<\/th><th scope=\"col\">Voltage<\/th><th scope=\"col\">Partnership<\/th><th scope=\"col\">RAP (2025-26 cycle) R$ mn<\/th><th scope=\"col\">Capex ANEEL<\/th><th scope=\"col\">Contract Signing<\/th><th scope=\"col\">Preliminary License (LP)<\/th><th scope=\"col\"> Installation License (LI)<\/th><th scope=\"col\">Estimated Conclusion ANEEL<\/th>        <\/tr>\n        <\/thead>\n        <tbody>\n        <tr class=\"separator\">\n            <td colspan=\"12\"><\/td>\n        <\/tr>\n\t\t<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab01\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab01-0\" class=\"tab01-row col-th-0\">Mariana (Lot A)<\/th><th id=\"tab01-1\" class=\"tab01-row col-th-1\">Auction 013\/2013 (Dec-13)<\/th><th id=\"tab01-2\" class=\"tab01-row col-th-2\">82 km \/ Minas Gerais<\/th><th id=\"tab01-3\" class=\"tab01-row col-th-3\">500 kV<\/th><th id=\"tab01-4\" class=\"tab01-row col-th-4\">100% TAESA<\/th><th id=\"tab01-5\" class=\"tab01-row col-th-5\">23.9<\/th><th id=\"tab01-6\" class=\"tab01-row col-th-6\">107<\/th><th id=\"tab01-7\" class=\"tab01-row col-th-7\">May-14<\/th><th id=\"tab01-8\" class=\"tab01-row col-th-8\">\u2714<\/th><th id=\"tab01-9\" class=\"tab01-row col-th-9\">\u2714<\/th><th id=\"tab01-10\" class=\"tab01-row col-th-10\">Concluded in May-20<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab01\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Preliminary License (LP) issued in May 2016.<\/li>\n<li>Installation and Operation License&#8217;s (LI and LO) issued in december 2018.<\/li>\n<li>Issuance of TLD (<em>Termo de Libera\u00e7\u00e3o Definitiva<\/em>) on December 20, 2019 for Mariana reinforcement.<\/li>\n<li>Energization scheduled for May 25, 2020.<\/li>\n<li>Issuance of TLD (Termo de Libera\u00e7\u00e3o Definitivo) on June 8, 2020, with date to entry into retroactive commercial operation on June 4, 2020.<\/li>\n<li>Concession in operation.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab02\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab02-0\" class=\"tab02-row col-th-0\">Miracema<br \/>\n(Lot P)<\/th><th id=\"tab02-1\" class=\"tab02-row col-th-1\">Auction 013\/2015 (Apr-16)<\/th><th id=\"tab02-2\" class=\"tab02-row col-th-2\">90 km \/ Tocantins<\/th><th id=\"tab02-3\" class=\"tab02-row col-th-3\">230 kV e 500 kV<\/th><th id=\"tab02-4\" class=\"tab02-row col-th-4\">100% TAESA<\/th><th id=\"tab02-5\" class=\"tab02-row col-th-5\">104.2<\/th><th id=\"tab02-6\" class=\"tab02-row col-th-6\">276<\/th><th id=\"tab02-7\" class=\"tab02-row col-th-7\">Jun-16<\/th><th id=\"tab02-8\" class=\"tab02-row col-th-8\">\u2714<\/th><th id=\"tab02-9\" class=\"tab02-row col-th-9\">\u2714<\/th><th id=\"tab02-10\" class=\"tab02-row col-th-10\">Concluded in Nov-19<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab02\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>All environmental licenses have been obtained: Installation and Preliminary Licenses of LT 500kV, LT 230Kv, SE Palmas, SE Lajeado, and SE Miracema.<\/li>\n<li>Recognition of the right to SUDAM&#8217;s tax benefit in September 2018. The benefit will last for 10 years from the start of its operations.<\/li>\n<li>The section LT Miracema &#8211; Lajeado (circuit 2), with 500kV of voltage and 30 km of extension, was energized in September 2019.<\/li>\n<li>Issuance of TLD (<em>Termo de Libera\u00e7\u00e3o Definitiva<\/em>) on October 1, 2019 for the reinforcement, on December 27, 2019 for the 500kV installations, and on February 18, 2020 for the 230kV and 138kV installations, where for the latter, a TLR (Termo de LIbera\u00e7\u00e3o de Receita) was issued for the period between December 27, 2019 and February 7, 2020.<\/li>\n<li>Concession in operation.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab03\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab03-0\" class=\"tab03-row col-th-0\">EDTE (Lot M)<\/th><th id=\"tab03-1\" class=\"tab03-row col-th-1\">Auction 013\/2015 (Apr-16)<\/th><th id=\"tab03-2\" class=\"tab03-row col-th-2\">167 km \/ Bahia<\/th><th id=\"tab03-3\" class=\"tab03-row col-th-3\">230 kV<\/th><th id=\"tab03-4\" class=\"tab03-row col-th-4\">25% TAESA<br \/>\n25% Apollo 12 50% ENTE<\/th><th id=\"tab03-5\" class=\"tab03-row col-th-5\">52.4<\/th><th id=\"tab03-6\" class=\"tab03-row col-th-6\">368<\/th><th id=\"tab03-7\" class=\"tab03-row col-th-7\">Dec-16<\/th><th id=\"tab03-8\" class=\"tab03-row col-th-8\">\u2714<\/th><th id=\"tab03-9\" class=\"tab03-row col-th-9\">\u2714<\/th><th id=\"tab03-10\" class=\"tab03-row col-th-10\">Concluded in Jan-20<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab03\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Preliminary License (LP) issued in June 2018.<\/li>\n<li>2nd Inssuance of EDTE debentures in december 2018.<\/li>\n<li>Installation License (LI) issued in january 2019.<\/li>\n<li>Energizatoin of the TL 500kV Ibicoara \u2013 Po\u00e7\u00f5es III spread and the 500\/230kV Po\u00e7\u00f5es III substation in December 22, 2019.<\/li>\n<li>Last energization of EDTE refers to the TL 230kV Po\u00e7\u00f5es III \u2013 Po\u00e7\u00f5es II spread on January 20, 2020.<\/li>\n<li>Issuance of TLP (<em>Termo de Libera\u00e7\u00e3o Provis\u00f3ria<\/em>) on January 20, 2020.<\/li>\n<li>Issuance of TLD (<em>Termo de Libera\u00e7\u00e3o Definitiva<\/em>) on February 7, 2020.<\/li>\n<li>Concession in operation.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab04\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab04-0\" class=\"tab04-row col-th-0\">ESTE<br \/>\n(Lot 22)<\/th><th id=\"tab04-1\" class=\"tab04-row col-th-1\">Auction 013\/2015 2nd Part (Oct-16)<\/th><th id=\"tab04-2\" class=\"tab04-row col-th-2\">236 km \/ Minas Gerais and Esp\u00edrito Santo<\/th><th id=\"tab04-3\" class=\"tab04-row col-th-3\">500 kV<\/th><th id=\"tab04-4\" class=\"tab04-row col-th-4\">50% TAESA<br \/>\n50% Alupar<br \/>\n(100% EATE-TBE)<\/th><th id=\"tab04-5\" class=\"tab04-row col-th-5\">84.7<\/th><th id=\"tab04-6\" class=\"tab04-row col-th-6\">486<\/th><th id=\"tab04-7\" class=\"tab04-row col-th-7\">Feb-17<\/th><th id=\"tab04-8\" class=\"tab04-row col-th-8\">\u2714<\/th><th id=\"tab04-9\" class=\"tab04-row col-th-9\">\u2714<\/th><th id=\"tab04-10\" class=\"tab04-row col-th-10\">Concluded in Feb-22<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab04\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Basic project registered with ANEEL and already approved in ONS.<\/li>\n<li>Preliminary License (LP) issued in January 2019.<\/li>\n<li>Installation License (LI) issued in October 2019.<\/li>\n<li>1st issuance of debentures of ESTE in December 2019.<\/li>\n<li>Issued the OSC (Ordem de Servi\u00e7o de Campo) for the start of field work.<\/li>\n<li>Project concluded and awaiting ONS in order to energize.                 <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab05\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab05-0\" class=\"tab05-row col-th-0\">Jana\u00faba<\/li>\n<\/ul>\n<p>(Lot 17)<\/th><th id=\"tab05-1\" class=\"tab05-row col-th-1\">Auction 013\/2015 2nd Part (Oct-16)<\/th><th id=\"tab05-2\" class=\"tab05-row col-th-2\">545 km \/ Bahia and Minas Gerais<\/th><th id=\"tab05-3\" class=\"tab05-row col-th-3\">500 kV<\/th><th id=\"tab05-4\" class=\"tab05-row col-th-4\">100% TAESA<\/th><th id=\"tab05-5\" class=\"tab05-row col-th-5\">293.0<\/th><th id=\"tab05-6\" class=\"tab05-row col-th-6\">960<\/th><th id=\"tab05-7\" class=\"tab05-row col-th-7\">Feb-17<\/th><th id=\"tab05-8\" class=\"tab05-row col-th-8\">\u2714<\/th><th id=\"tab05-9\" class=\"tab05-row col-th-9\">\u2714<\/th><th id=\"tab05-10\" class=\"tab05-row col-th-10\">Concluded in Sept-21<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab05\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Basic project is approved by ANEEL\/ONS for the substations and under review for transmission lines.<\/li>\n<li>The design implementation \/ topography activities were completed.<\/li>\n<li>Preliminary License (LP) issued in September 2018.<\/li>\n<li>Financing agreement signed with BNB in September 2018.<\/li>\n<li>Recognition of the right to SUDENE\u2019s tax benefit in September 2018. The benefit will last for 10 years from the start of its operations.<\/li>\n<li>1st Issuance of Jana\u00faba debentures in January 2019.<\/li>\n<li>Installation License (LI) issued in July 2019.<\/li>\n<li>2nd issuance of Jana\u00faba debentures in December 2019.<\/li>\n<li>Concession in operation.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab06\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab06-0\" class=\"tab06-row col-th-0\">Aimor\u00e9s<br \/>\n(Lot 4)<\/th><th id=\"tab06-1\" class=\"tab06-row col-th-1\">Auction 013\/2015 2nd Part (Oct-16)<\/th><th id=\"tab06-2\" class=\"tab06-row col-th-2\">208 km \/ Minas Gerais<\/th><th id=\"tab06-3\" class=\"tab06-row col-th-3\">500 kV<\/th><th id=\"tab06-4\" class=\"tab06-row col-th-4\">50% TAESA<br \/>\n50% Cteep<\/th><th id=\"tab06-5\" class=\"tab06-row col-th-5\">559.9<\/th><th id=\"tab06-6\" class=\"tab06-row col-th-6\">341<\/th><th id=\"tab06-7\" class=\"tab06-row col-th-7\">Feb-17<\/th><th id=\"tab06-8\" class=\"tab06-row col-th-8\">\u2714<\/th><th id=\"tab06-9\" class=\"tab06-row col-th-9\">\u2714<\/th><th id=\"tab06-10\" class=\"tab06-row col-th-10\">Concluded in May-22<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab06\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Basic project approved by ANEEL.<\/li>\n<li>Preliminary License (LP) issued in October 2018.<\/li>\n<li>Recognition of the right to SUDENE&#8217;s tax benefit in December 2018. The benefit will last for 10 years from the operating start of the project.<\/li>\n<li>Installation License (LI) issued in April 2019.<\/li>\n<li>Concession in operation.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab07\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab07-0\" class=\"tab07-row col-th-0\">Paragua\u00e7u<br \/>\n(Lot 3)<\/th><th id=\"tab07-1\" class=\"tab07-row col-th-1\">Auction 013\/2015 2nd Part (Oct-16)<\/th><th id=\"tab07-2\" class=\"tab07-row col-th-2\">338 km \/ Bahia and Minas Gerais<\/th><th id=\"tab07-3\" class=\"tab07-row col-th-3\">500 kV<\/th><th id=\"tab07-4\" class=\"tab07-row col-th-4\">50% TAESA<br \/>\n50% Cteep<\/th><th id=\"tab07-5\" class=\"tab07-row col-th-5\">89.5<\/th><th id=\"tab07-6\" class=\"tab07-row col-th-6\">510<\/th><th id=\"tab07-7\" class=\"tab07-row col-th-7\">Feb-17<\/th><th id=\"tab07-8\" class=\"tab07-row col-th-8\">\u2714<\/th><th id=\"tab07-9\" class=\"tab07-row col-th-9\">\u2714<\/th><th id=\"tab07-10\" class=\"tab07-row col-th-10\">Concluded in Jul-22<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab07\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Basic project registered with ANEEL.<\/li>\n<li>Preliminary License (LP) issued in October 2018.<\/li>\n<li>Recognition of the right to SUDENE&#8217;s tax benefit in December 2018. The benefit will last for 10 years from the operating start of the project.<\/li>\n<li>Instalation License (LI) issued in May 2019.<\/li>\n<li>\u00a0Issuance of TLD (Termo de Libera\u00e7\u00e3o Definitiva) on July 27, 2022.<\/li>\n<li>Concession in operation.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab08\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab08-0\" class=\"tab08-row col-th-0\">Iva\u00ed (Lot 1)<\/th><th id=\"tab08-1\" class=\"tab08-row col-th-1\">Auction 005\/2016 (Apr-16)<\/th><th id=\"tab08-2\" class=\"tab08-row col-th-2\">600 km \/ Paran\u00e1<\/th><th id=\"tab08-3\" class=\"tab08-row col-th-3\">230 kV and 525 kV<\/th><th id=\"tab08-4\" class=\"tab08-row col-th-4\">50% TAESA<br \/>\n50% Cteep<\/th><th id=\"tab08-5\" class=\"tab08-row col-th-5\">217.8<\/th><th id=\"tab08-6\" class=\"tab08-row col-th-6\">1.937<\/th><th id=\"tab08-7\" class=\"tab08-row col-th-7\">Aug-17<\/th><th id=\"tab08-8\" class=\"tab08-row col-th-8\">\u2714<\/th><th id=\"tab08-9\" class=\"tab08-row col-th-9\">\u2714<\/th><th id=\"tab08-10\" class=\"tab08-row col-th-10\">Concluded Mar -24<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab08\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Basic project proposal filed with ANEEL.<\/li>\n<li>EIA\/RIMA registered with IAP.<\/li>\n<li>Preliminary License (LP) for the 230 kV installations issued in September 2018.<\/li>\n<li>Change in corporate name of El\u00e9tricas Reunidas do Brasil S.A. (ERB1) for Interliga\u00e7\u00e3o El\u00e9trica Iva\u00ed S.A.<\/li>\n<li>Installation Licence (LI) issued for SE Sarandi of 525\/230 kV in April 2019, SE Paranava\u00ed Norte &#8211; 230\/138 kV in May 2019, LT 230 kV Sarandi &#8211; Paranava\u00ed Norte in June 2019, and for the Substations Londrina of 525 kV, Foz do Igua\u00e7u of 525 kV and Gua\u00edra of 525 kV\/230 kV and the LT 525 kV Sarandi &#8211; Londrina in August 2019.<\/li>\n<li>1st issuance of debentures of Iva\u00ed in January 2020.<\/li>\n<li>Provisional Release Terms issued (i) in November 2022, for the 525kV corridor for the LT Foz do Igua\u00e7u \u2013 Gua\u00edra transmission lines (double circuit), 525 kV General Modules of SE Foz do Igua\u00e7u and SE Gua\u00edra, Banks of 525 kV Reactors at SE Gua\u00edra, and (ii) in May 2023, for the 525\/230 kV Transformer Banks at SE Gua\u00edra. TLDs issued for these segments in May 2023.<\/li>\n<li>Provisional Release Terms issued for the 525 kV corridor for the LT 525 kV Gua\u00edra \u2013 Sarandi transmission lines (double circuit) in November 2022, with TLD issued in December 2022.<\/li>\n<li>Provisional Release Terms issued for the 525kV corridor of the SE Gua\u00edra Reactor Banks in November 2022, with TLD issued in January 2023.<\/li>\n<li>Provisional Release Terms issued for the start of commercial operation of the Capacitor Bank 138kV-30 Mvar of SE Paranava\u00ed Norte, the General Mode 230 kV of SE Paranava\u00ed Norte with interconnections, Transformer Banks 230\/138 kV of SE Paranava\u00ed Norte, LT 230 kV Sarandi \u2013 Paranava\u00ed Norte (double circuit) and 138 kV Paranava\u00ed line inputs and LT 230 kV Sarandi-Paranava\u00ed Norte (double circuit) in January 2023, TLD issued in April 2023.<\/li>\n<li>Provisional Release Terms and TLD issued for LT 525 kV Sarandi \u2013 Londrina C1 in November 2022. Provisional Release Terms issued for LT 525 kV Sarandi \u2013 Londrina C2 in November 2022. TLD issued for General Module 525 kV of SE Londrina in November 2022.<\/li>\n<li>Provisional Release Terms issued for the 525 kV General Model of SE Sarandi, the 525 kV Reactor Banks of 525\/230 kV \u2013 150 Mvar, and the 525\/230 kV Reactor Banks of SE Sarandi in November 2022.<\/li>\n<li>Provisional Release Terms issued for the 525 kV General Model of SE Sarandi, the 525 kV Reactor Banks of 525\/230 kV \u2013 150 Mvar, and the 525\/230 kV Reactor Banks of SE Sarandi in November 2022. TLDs issued for these sections in August 2023.<\/li>\n<li>Construction progress: 100.0% accomplished as of March 31, 2024.<\/li>\n<li>\u00a0Complete commercial operational start-up as of March 3, 2024.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab09\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab09-0\" class=\"tab09-row col-th-0\">Sant'Ana (Lot 12)<\/th><th id=\"tab09-1\" class=\"tab09-row col-th-1\">Auction 004\/2018<\/th><th id=\"tab09-2\" class=\"tab09-row col-th-2\">558 km \/ Rio Grande do Sul<\/th><th id=\"tab09-3\" class=\"tab09-row col-th-3\">230 kV<\/th><th id=\"tab09-4\" class=\"tab09-row col-th-4\">100% TAESA<\/th><th id=\"tab09-5\" class=\"tab09-row col-th-5\">93.0<\/th><th id=\"tab09-6\" class=\"tab09-row col-th-6\">610<\/th><th id=\"tab09-7\" class=\"tab09-row col-th-7\">Mar-19<\/th><th id=\"tab09-8\" class=\"tab09-row col-th-8\">\u2714<\/th><th id=\"tab09-9\" class=\"tab09-row col-th-9\">\u2714<\/th><th id=\"tab09-10\" class=\"tab09-row col-th-10\">Concluded in Dec-23<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab09\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Establishment of the company Sant\u2019Ana Transmissora de Energia S.A. in January 2019.<\/li>\n<li>Execution of the concession agreement on March 22, 2019.<\/li>\n<li>Previous and Installation Licences (LPI) issued for the SEs Livramento 3 and Ma\u00e7ambar\u00e1 3, both with 230kV, in October 2019.<\/li>\n<li>Previous Licenses (LP) issued for all transmission lines and for the 3 existing substations (SE Alegrete 2, SE Cerro Chato and SE Santa Maria 3) in December 2019.<\/li>\n<li>Installation Licence issued for the transmission lines LT Livramento 3 \u2013 Alegrete 2 (C1), LT Livramento 3 \u2013 Ma\u00e7ambar\u00e1 3 (C1), LT Livramento 3 \u2013 Cerro Chato (C1), and LT Ma\u00e7ambar\u00e1 \u2013 Santo \u00c2ngelo (C1\/C2), all with 230kV voltage, as well as for the expansion of existing substations of SE 230kV Alegrete 2 and SE 230kV Cerro Chato on April 9, 2020.<\/li>\n<li>Issuance of the last installation license in November 2020 referring to the LT 230kV CS Livramento 3 &#8211; Santa Maria 3 and for the expansion of existing associated substations.<\/li>\n<li>Release Terms issued on April 1st, 2022, retroactively dated for March 28, 2022, for transmission lines LT Livramento 3 \u2013 Alegrete 2 e LT Livramento 3 \u2013 Cerro Chato and part of substation SE 230 kV Livramento 3.<\/li>\n<li>Release Terms issued on December 7, 2022, retroactively dated for November 30, 2022, for transmission lines LT Livramento 3 \u2013 Ma\u00e7ambar\u00e1 3, substation SE Santa Maria 3 and Subsection Ma\u00e7ambar\u00e1 \u2013 Santo \u00c2ngelo em Ma\u00e7ambar\u00e1 3 C1.<\/li>\n<li>Energization of the stretch of LT Livramento 3 \u2013 Santa Maria 3 and SE Santa Maria 3 on May 2, 2023.<\/li>\n<li>Energization of the Livramento 3 SE Synchronous Compensator on May 18, 2023.Energization of the Ma\u00e7ambar\u00e1 \u2013 Santo \u00c2ngelo Sectioning in Ma\u00e7ambar\u00e1 3 C2 on August 25, 2023.<\/li>\n<li>Construction progress: 100% accomplished as of December 31, 2023.<\/li>\n<li>Complete operational start-up in December 2023.<\/li>\n<li>Note: The project became fully operational and currently receives ~96% of its RAP due to technical<br \/>\nissues that are being reconciled with ANEEL and once resolved, Sant&#8217;Ana will receive 100% of its<br \/>\nRAP.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n<\/p>\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab10\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab10-0\" class=\"tab10-row col-th-0\">Anana\u00ed (Lot 1)<\/th><th id=\"tab10-1\" class=\"tab10-row col-th-1\">Auction 002\/2021<\/th><th id=\"tab10-2\" class=\"tab10-row col-th-2\">363 km \/ S\u00e3o Paulo and Paran\u00e1<\/th><th id=\"tab10-3\" class=\"tab10-row col-th-3\">230 kV<\/th><th id=\"tab10-4\" class=\"tab10-row col-th-4\">100% TAESA<\/th><th id=\"tab10-5\" class=\"tab10-row col-th-5\">171.1<\/th><th id=\"tab10-6\" class=\"tab10-row col-th-6\">1750<\/th><th id=\"tab10-7\" class=\"tab10-row col-th-7\">Mar-22<\/th><th id=\"tab10-8\" class=\"tab10-row col-th-8\">\u2714<\/th><th id=\"tab10-9\" class=\"tab10-row col-th-9\">\u2714<\/th><th id=\"tab10-10\" class=\"tab10-row col-th-10\">Mar-27<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab10\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Incorporation of the company Anana\u00ed Transmissora de Energia El\u00e9trica S.A. in December 2021 to build and operate Lot 1 of Auction 02\/2021.<\/li>\n<li>Concession contract formally signed on March 31, 2022<\/li>\n<li>Preliminary License (LP) for the section of LT Bateias \u2013 Curitiba Leste issued in August 2023 and for the section of LT Ponta Grossa \u2013 Assis issued in September 2023.<\/li>\n<li>Installation License (LI) issued for the LT 525 kV Bateias \u2013 Curitiba Leste section, including the works to expand the SE Bateias and SE Curitiba Leste substations to be interconnected, issued in June 2024.<\/li>\n<li>Installation License (LI) for the 00 kV Ponta Grossa \u2013 Assis LT section, including the expansion works of the SE Ponta Grossa and SE Assis Substations to be interconnected, issued in November 2024.<\/li>\n<li>Physical progress: 66.9% on September 30, 2025.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab10\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab10-0\" class=\"tab10-row col-th-0\">Pitiguari (Lot 102)<\/th><th id=\"tab10-1\" class=\"tab10-row col-th-1\">Auction 001\/2022<\/th><th id=\"tab10-2\" class=\"tab10-row col-th-2\">363 km \/ Santa Catarina<\/th><th id=\"tab10-3\" class=\"tab10-row col-th-3\">230 kV<\/th><th id=\"tab10-4\" class=\"tab10-row col-th-4\">100% TAESA<\/th><th id=\"tab10-5\" class=\"tab10-row col-th-5\">23.4<\/th><th id=\"tab10-6\" class=\"tab10-row col-th-6\">243<\/th><th id=\"tab10-7\" class=\"tab10-row col-th-7\">Mar-22<\/th><th id=\"tab10-8\" class=\"tab10-row col-th-8\">\u2714<\/th><th id=\"tab10-9\" class=\"tab10-row col-th-9\">\u2714<\/th><th id=\"tab10-10\" class=\"tab10-row col-th-10\">Concluded Jun-25<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab10\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Creation of the company Pitiguari Transmissora de Energia El\u00e9trica S.A. in June 2022 to build and operate Lot<br \/>\n10 of Auction 01\/2022.<\/li>\n<li>Concession contract formally signed on September 30, 2022.<\/li>\n<li>Preliminary License (LP) issued for the LT Abdon Batista \u2013 Videira and LT Abdon Batista \u2013 Barra Grande sections issued in August 2023.<\/li>\n<li>Installation License (LI) issued for the LT 230 kV Abdon Batista \u2013 Videira and LT 230 kV Abdon Batista \u2013 Barra Grande sections, including the expansion works of the SE Barra Grande, SE Abdon Batista and SE Videira substations, issued in February 2024.<\/li>\n<li>Issuance of the Release Term for the LT 230 kV Abdon Batista &#8211; Barra Grande section in December 2024, representing 20% of the project&#8217;s RAP.<\/li>\n<li>\u00a0Complete commercial operational start-up as of Juno, 2025.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab12\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab12-0\" class=\"tab12-row col-th-0\">Tangar\u00e1<br \/>\n(Lot 03)<\/th><th id=\"tab12-1\" class=\"tab12-row col-th-1\"><strong> Auction 002\/2022<br \/>\n<\/strong>Dec\/22<\/th><th id=\"tab12-2\" class=\"tab12-row col-th-2\">279 km \/<br \/><\/th><th id=\"tab12-3\" class=\"tab12-row col-th-3\">230 kV<\/th><th id=\"tab12-4\" class=\"tab12-row col-th-4\">100% TAESA<\/th><th id=\"tab12-5\" class=\"tab12-row col-th-5\">108.3<\/th><th id=\"tab12-6\" class=\"tab12-row col-th-6\">1.117<\/th><th id=\"tab12-7\" class=\"tab12-row col-th-7\">mar\/23<\/th><th id=\"tab12-8\" class=\"tab12-row col-th-8\">\u2714<\/th><th id=\"tab12-9\" class=\"tab12-row col-th-9\">\u2714<\/th><th id=\"tab12-10\" class=\"tab12-row col-th-10\">mar\/28<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab12\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Creation of the company Tangar\u00e1 Transmissora de Energia El\u00e9trica S.A. in December 2022 to build and operate<br \/>\nLot 3 of Auction 002\/2022.<\/li>\n<li>Concession contract formally signed on March 30, 2023.<\/li>\n<li>Preliminary License (LP) issued for Santa Luzia III Substation issued in December 2023 and for LT 230kV A\u00e7ail\u00e2ndia \u2013 Dom Eliseu II and for LT 230kV Encruzo Novo \u2013 Santa Luzia III in January 2024.<\/li>\n<li>Unified Environmental License issued for SE Encruzo Novo in January 2024.<\/li>\n<li>Preliminary License (LP) issued for the sectioning of the LT 230 kV A\u00e7ail\u00e2ndia \u2013 Miranda II in February 2024.<\/li>\n<li>Installation License (LI) issued for the SE Santa Luzia III substation in February 2024.<\/li>\n<li>Installation License (LI) issued for SE A\u00e7ail\u00e2ndia, SE Dom Eliseu II and LT 230 kV Encruzo Novo \u2013 Santa Luzia III in June 2024.<\/li>\n<li>Installation License (LI) issued for the sectioning of the LT 500 kV A\u00e7ail\u00e2ndia \u2013 Miranda II in SE Santa Luzia III in October 2024.<\/li>\n<li>Installation License for the 230 kV A\u00e7ail\u00e2ndia \u2013 Dom Eliseu II Transmission Line in November 2024.<\/li>\n<li>Physical progress: 85.1% as of September 30, 2025<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab13\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab13-0\" class=\"tab13-row col-th-0\">Sa\u00edra<br \/>\n(Lote 05)<\/th><th id=\"tab13-1\" class=\"tab13-row col-th-1\"><strong> Auction 002\/2022<br \/>\n<\/strong>Dec\/22<\/th><th id=\"tab13-2\" class=\"tab13-row col-th-2\">743 km \/<br \/><\/th><th id=\"tab13-3\" class=\"tab13-row col-th-3\">500 kV<\/th><th id=\"tab13-4\" class=\"tab13-row col-th-4\">100% TAESA<\/th><th id=\"tab13-5\" class=\"tab13-row col-th-5\">191.7<\/th><th id=\"tab13-6\" class=\"tab13-row col-th-6\">1.175<\/th><th id=\"tab13-7\" class=\"tab13-row col-th-7\">mar\/23<\/th><th id=\"tab13-8\" class=\"tab13-row col-th-8\">\u2714<\/th><th id=\"tab13-9\" class=\"tab13-row col-th-9\">\u2714<\/th><th id=\"tab13-10\" class=\"tab13-row col-th-10\">mar\/28<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab13\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t<\/p>\n<ul>\n<li>Creation of the company Sa\u00edra Transmissora de Energia El\u00e9trica S.A. on December 2022 to build and operate Lot 5 of Auction 002\/2022.<\/li>\n<li>Concession contract formally on March 30, 2023.<\/li>\n<li>Garabi I and II units and Transmission Lines LT Santo \u00c2ngelo \u2013 It\u00e1, LT Garabi 2 \u2013 Santo \u00c2ngelo, and LT Garabi 1- Fronteira are operational with active RAP (phase 1) as of March 31, 2023.<\/li>\n<li>Concession incorporated into TAESA on December 29, 2023.<\/li>\n<li>Revitalizations (2nd phase) &#8211; Physical progress: 88.8% by September 30, 2025.<\/li>\n<\/ul>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#tab13\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t        <th scope=\"row\"><i class=\"status\"><\/i><\/th>\n\t\t<th id=\"tab13-0\" class=\"tab13-row col-th-0\">Juru\u00e1(Lote 03)<\/th><th id=\"tab13-1\" class=\"tab13-row col-th-1\"><strong> Auction 002\/2024 <\/strong>Set\/24<\/th><th id=\"tab13-2\" class=\"tab13-row col-th-2\">1.2 km \/<\/th><th id=\"tab13-3\" class=\"tab13-row col-th-3\">500 kV<\/th><th id=\"tab13-4\" class=\"tab13-row col-th-4\">100% TAESA<\/th><th id=\"tab13-5\" class=\"tab13-row col-th-5\">19.6<\/th><th id=\"tab13-6\" class=\"tab13-row col-th-6\">244<\/th><th id=\"tab13-7\" class=\"tab13-row col-th-7\">dec\/24<\/th><th id=\"tab13-8\" class=\"tab13-row col-th-8\"><\/th><th id=\"tab13-9\" class=\"tab13-row col-th-9\"><\/th><th id=\"tab13-10\" class=\"tab13-row col-th-10\">jun\/28<\/th><\/tr>\n    <tr class=\"acc-table-row\">\n        <td colspan=\"12\">\n            <div id=\"tab13\" data-parent=\"#transmissao\" class=\"collapse\">\n                <div class=\"acc-element\">\n\t\t\t\t\t\n<p>\u2022 Establishment of Juru\u00e1 Transmissora de Energia El\u00e9trica S.A. in December 2024 to build and operate Lot 3 of Auction 02\/2024<br \/>\n\u2022 Physical progress: 7.9% as of September 30, 2025.<\/p>\n<p>                <\/div>\n            <\/div>\n        <\/td>\n    <\/tr>\n<tr class=\"separator\">\n    <td colspan=\"12\"><\/td>\n<\/tr>\n\n        <\/tbody>\n    <\/table>\n<\/div>\n[vc_column_text css=&#8221;.vc_custom_1616425682392{margin-top: -16px !important;margin-bottom: 20px !important;padding-top: 20px !important;padding-right: 20px !important;padding-bottom: 20px !important;padding-left: 20px !important;background-color: #e3eaef !important;}&#8221;][\/vc_column_text][\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1544727098921{margin-bottom: 20px !important;}&#8221;][vc_column][vc_column_text]<\/p>\n<h4><strong>Brownfield (M&amp;A)<\/strong><\/h4>\n<p>[\/vc_column_text][vc_column_text]<span style=\"color: #253e6a;\"><strong>Asset &#8211; Lagoa Nova Transmiss\u00e3o de Energia El\u00e9trica S.A<\/strong><\/span><\/p>\n<p>On March 13, 2020, the Company disclosed a <a href=\"https:\/\/ri.taesa.com.br\/wp-content\/uploads\/2018\/11\/20200313-Comunicado-ao-Mercado-Aquisi%C3%A7%C3%A3o-Rialma-Closing_Vfinal_ING.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Notice to the Market<\/strong><\/a> informing the conclusion on this date, after the fulfillment of all the preceding conditions, the acquisition of 100% of the shares representing the total and voting capital of Rialma Transmissora de Energia I S.A. ( \u201cRialma I\u201d), through the payment of the total amount of R $ 60,482,000.00, after the adjustments resulting from the variation of the working capital balances and net debt between the base date (June 30, 2019) and the closing date of the transaction (March 13, 2020). The Extraordinary General Meeting held on March 13, 2020 approved the change of the corporate name of Rialma I, which was renamed Lagoa Nova Transmiss\u00e3o de Energia El\u00e9trica S.A.<\/p>\n<p>The completion of the transaction resulted in the acquisition of an asset located in the State of Rio Grande do Norte, interconnected with one of Taesa&#8217;s substations &#8211; SE Lagoa Nova of Para\u00edso A\u00e7u Transmissora de Energia S.A. -, allowing operational advantages in maintaining the new asset, and consequently, contributing to the Company&#8217;s growth plan and its consolidation in the Brazilian transmission sector. Lagoa Nova comprises the 230kV transmission line Lagoa Nova 11 \u2013 Currais Novos 11, double circuit, with an extension of 28 km and Annual Permitted Revenues (RAP) of R$ 12.8 million (2020-2021 cycle).<\/p>\n<p>The table below shows a summary of the transaction:[\/vc_column_text]<div class=\"table-responsive\">\n    <table id=\"unicoTabela\" class=\"table table-borderless table-acc\">\n        <thead>\n        <tr>\n\t\t\t\t\t\t<th scope=\"col\">Asset<\/th><th scope=\"col\">Auction\/Lot<\/th><th scope=\"col\">Extension\/Location<\/th><th scope=\"col\">Voltage<\/th><th scope=\"col\">Acquisition Value R$ MM<\/th><th scope=\"col\">RAP\u00b9 (cycle 2021-22) R$\u2019 000<\/th><th scope=\"col\">Acquired Stake<\/th><th scope=\"col\">End of Concession<\/th><th scope=\"col\">Category<\/th>        <\/tr>\n        <\/thead>\n        <tbody>\n        <tr class=\"separator\">\n            <td colspan=\"10\"><\/td>\n        <\/tr>\n\t\t<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#segundatab\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t\t<th id=\"segundatab-0\" class=\"segundatab-row col-th-0\">Nova Lagoa Transmiss\u00e3o de Energia El\u00e9trica S.A<\/th><th id=\"segundatab-1\" class=\"segundatab-row col-th-1\">005\/2016 (Lot 9)<\/th><th id=\"segundatab-2\" class=\"segundatab-row col-th-2\">28km \/ Rio Grande do Norte<\/th><th id=\"segundatab-3\" class=\"segundatab-row col-th-3\">230 kV<\/th><th id=\"segundatab-4\" class=\"segundatab-row col-th-4\">60.482<\/th><th id=\"segundatab-5\" class=\"segundatab-row col-th-5\">13.9<\/th><th id=\"segundatab-6\" class=\"segundatab-row col-th-6\">100%<\/th><th id=\"segundatab-7\" class=\"segundatab-row col-th-7\">aug-47<\/th><th id=\"segundatab-8\" class=\"segundatab-row col-th-8\">3<\/th><\/tr>\n<tr class=\"separator\">\n    <td colspan=\"10\"><\/td>\n<\/tr>\n\n        <\/tbody>\n    <\/table>\n<\/div>\n[vc_column_text css=&#8221;.vc_custom_1601472242807{margin-top: -16px !important;margin-bottom: 30px !important;padding-top: 20px !important;padding-right: 20px !important;padding-bottom: 20px !important;padding-left: 20px !important;background-color: #e3eaef !important;}&#8221;]<\/p>\n<h6>(1) Value of RAP (Annual Revenue Allowed) for the 2020-2021 cycle, considering the stake acquired by TAESA<\/h6>\n<p>[\/vc_column_text][vc_column_text]<strong><span style=\"color: #253e6a;\">Assets of \u00c2mbar Energia<\/span> <\/strong><\/p>\n<p>In the <a href=\"https:\/\/ri.taesa.com.br\/wp-content\/uploads\/importer-old-site\/taesa_fatorelevante_20181217_en_3939_656_22518.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Material Fact<\/strong><\/a> released on December 17, 2018, the Company announced the signing of a Share Purchase Agreement with \u00c2mbar Energia Ltda. and Fundo de Investimento em Participa\u00e7\u00f5es Multiestrat\u00e9gia Mil\u00e3o, with the purpose of acquiring the four assets mentioned above by the Company, for the amount of R$ 942,537,000.00 (base date: December 31, 2018).<\/p>\n<p>On February 14, 2020, the Company disclosed a <a href=\"https:\/\/ri.taesa.com.br\/wp-content\/uploads\/2018\/11\/2020.02.14-Fato-Relevante-Conclus%C3%A3o-da-Aquisi%C3%A7%C3%A3o-SJT-e-SPT_VF_ing.pdf\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>Material Fact<\/strong><\/a> informing the conclusion of the acquisition of 100% of the shares representing the total and voting capital of S\u00e3o Jo\u00e3o Transmissora de Energia S.A. and S\u00e3o Pedro Transmissora de Energia S.A., through the payment of R$ 753,168,061.88, under the terms of the Contract, after the fulfillment of the suspensive conditions applicable to the acquisition.<\/p>\n<p>The conclusion of the acquisition of 51% of the shares representing the total and voting capital of Tri\u00e2ngulo Mineiro Transmissora de Energia S.A. and Vale do S\u00e3o Bartolomeu Transmissora de Energia S.A. is still subject to compliance with the respective suspensive conditions.<\/p>\n<p>On June 10, 2020, the Company issued a Notice to the Market stating that the deadline for the acquisition of 51% of the shares representing the total voting and voting capital of Triangulo Mineiro Transmissora de Energia S.A. and Vale do S\u00e3o Bartolomeu Transmissora de Energia S.A. has expired and the contract was terminated in connection with the acquisition of these two assets.<\/p>\n<p>The completion of the transaction resulted in the acquisition of important strategic assets located in the areas in which the Company operates, providing great geographical complementarity with TAESA\u2019s concession portfolio and therefore contributing to its growth plan and consolidation in the Brazilian transmission sector.<\/p>\n<p>The table below shows a summary of the transaction:[\/vc_column_text]<div class=\"table-responsive\">\n    <table id=\"unicoTabela\" class=\"table table-borderless table-acc\">\n        <thead>\n        <tr>\n\t\t\t\t\t\t<th scope=\"col\">Asset<\/th><th scope=\"col\">Auction\/Lot<\/th><th scope=\"col\">Extension\/Location<\/th><th scope=\"col\">Voltage<\/th><th scope=\"col\">Shareholders<\/th><th scope=\"col\">Acquisition Value\u00b9 R$ mn<\/th><th scope=\"col\">RAP (2021-22 cycle) R$ MM<\/th><th scope=\"col\">Net Debt\u00b2 R$ mn<\/th><th scope=\"col\">EBITDA\u00b3 Margin %<\/th><th scope=\"col\">EBITDA\u00b3 R$ mn<\/th><th scope=\"col\">End of Concession<\/th><th scope=\"col\">Category<\/th>        <\/tr>\n        <\/thead>\n        <tbody>\n        <tr class=\"separator\">\n            <td colspan=\"13\"><\/td>\n        <\/tr>\n\t\t<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#cres\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t\t<th id=\"cres-0\" class=\"cres-row col-th-0\">S\u00e3o Jo\u00e3o Transmissora de Energia (Lot A)<\/th><th id=\"cres-1\" class=\"cres-row col-th-1\">001\/2013<\/th><th id=\"cres-2\" class=\"cres-row col-th-2\">408 km \/ Piau\u00ed<\/th><th id=\"cres-3\" class=\"cres-row col-th-3\">500kV<\/th><th id=\"cres-4\" class=\"cres-row col-th-4\">100% Taesa<\/th><th id=\"cres-5\" class=\"cres-row col-th-5\">399.0<\/th><th id=\"cres-6\" class=\"cres-row col-th-6\">53.9<\/th><th id=\"cres-7\" class=\"cres-row col-th-7\">144.1<\/th><th id=\"cres-8\" class=\"cres-row col-th-8\">89.9<\/th><th id=\"cres-9\" class=\"cres-row col-th-9\">42.3<\/th><th id=\"cres-10\" class=\"cres-row col-th-10\">aug-43<\/th><th id=\"cres-11\" class=\"cres-row col-th-11\">3 - IPCA<\/th><\/tr>\n<tr class=\"separator\">\n    <td colspan=\"13\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t\t<th id=\"-0\" class=\"-row col-th-0\">S\u00e3o Pedro Transmissora de Energia (Lot C)<\/th><th id=\"-1\" class=\"-row col-th-1\">002\/2013<\/th><th id=\"-2\" class=\"-row col-th-2\">418 km \/ Bahia and Piau\u00ed<\/th><th id=\"-3\" class=\"-row col-th-3\">500 \/ 230 \/ 69 \/ 13.8 kV<\/th><th id=\"-4\" class=\"-row col-th-4\">100% Taesa<\/th><th id=\"-5\" class=\"-row col-th-5\">354.1<\/th><th id=\"-6\" class=\"-row col-th-6\">57.9<\/th><th id=\"-7\" class=\"-row col-th-7\">107<\/th><th id=\"-8\" class=\"-row col-th-8\">82.6<\/th><th id=\"-9\" class=\"-row col-th-9\">36.5<\/th><th id=\"-10\" class=\"-row col-th-10\">oct-43<\/th><th id=\"-11\" class=\"-row col-th-11\">3 - IPCA<\/th><\/tr>\n<tr class=\"separator\">\n    <td colspan=\"13\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t\t<th id=\"-0\" class=\"-row col-th-0\"><\/th><th id=\"-1\" class=\"-row col-th-1\"><\/th><th id=\"-2\" class=\"-row col-th-2\"><\/th><th id=\"-3\" class=\"-row col-th-3\"><\/th><th id=\"-4\" class=\"-row col-th-4\"><\/th><th id=\"-5\" class=\"-row col-th-5\">753.1<\/th><th id=\"-6\" class=\"-row col-th-6\">111.8<\/th><th id=\"-7\" class=\"-row col-th-7\">251.1<\/th><th id=\"-8\" class=\"-row col-th-8\"><\/th><th id=\"-9\" class=\"-row col-th-9\"><\/th><th id=\"-10\" class=\"-row col-th-10\"><\/th><th id=\"-11\" class=\"-row col-th-11\"><\/th><\/tr>\n<tr class=\"separator\">\n    <td colspan=\"13\"><\/td>\n<\/tr>\n\n        <\/tbody>\n    <\/table>\n<\/div>\n[vc_column_text css=&#8221;.vc_custom_1585942498505{margin-top: -16px !important;margin-bottom: 25px !important;padding-top: 20px !important;padding-right: 20px !important;padding-bottom: 20px !important;padding-left: 20px !important;background-color: #e3eaef !important;}&#8221;]<\/p>\n<h6>(1) Closing acquisition value &#8211; 2\/14\/2020<br \/>\n(2) Net Debt Amount on 12\/31\/2018<br \/>\n(3) Regulatory EBITDA estimated for 2019.<br \/>\n(*) On the closing date of the acquisition, Taesa paid the gross debt of these assets in the amount of R $ 242.7 million.<\/h6>\n<p>[\/vc_column_text][vc_column_text css=&#8221;.vc_custom_1562093389363{margin-bottom: 20px !important;}&#8221;]<a class=\"btn btn-cor-secundaria btn-responsive no-underline\" href=\"http:\/\/ri.taesa.com.br\/wp-content\/uploads\/2018\/12\/Material-de-Apoio-Projeto-Santa-B\u00e1rbara-ingl\u00eas.pdf\" target=\"_blank\"><i class=\"taesa-download\"><\/i> Download of Supporting Material<\/a>[\/vc_column_text][vc_column_text]For more information, access the <a href=\"http:\/\/ri.taesa.com.br\/en\/market-disclosure\/notices-release-material-facts\/\" target=\"_blank\" rel=\"noopener noreferrer\">Notices and Material Facts<\/a> page.[\/vc_column_text][vc_column_text]<span style=\"color: #253e6a;\"><strong>Eletrobras Auction 01\/2018<\/strong><\/span><\/p>\n<p>On September 27, 2018, TAESA took part in the auction held by Centrais El\u00e9tricas do Brasil (Eletrobras) (Auction no. 01\/2018) \u2013 see <a href=\"https:\/\/ri.taesa.com.br\/wp-content\/uploads\/2018\/11\/20180927-Fato-Relevante-Leil\u00e3o-Eletrobr\u00e1s_EN.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Material Fact<\/a> \u2013, where it submitted bids in lots L (Brasnorte), M (Transmineiras), N (ETAU), and P (Centroeste). For batches L, N and P, these were the only bids submitted, and, therefore, there were not competing offers. In October 2018, the Company notified Eletrobras of the exercise of its preemptive right over the SPEs belonging to lot M, as provided for in the call for bids and in strict accordance with the provisions of the Transmineiras shareholders\u2019 agreements. In November 2018, Eletrobras approved the acquisition of TAESA in lots M (Transmineiras) and in January 2019, in lots L (Brasnorte) and N (ETAU), thereby closing the formal auction process. As a result, the Company entered into agreements for the purchase and sale of Eletrobras\u2019 shareholdings in Brasnorte, ETAU and Transmineiras, obtaining the necessary prior approvals from the Administrative Council for Economic Defense (CADE).<\/p>\n<p>On April 29, 2019, TAESA concluded the acquisition of lot N and, on May 31, 2019, the Company concluded the acquisition of lots L and M. See below for further details of the transaction:[\/vc_column_text]<div class=\"table-responsive\">\n    <table id=\"unicoTabela\" class=\"table table-borderless table-acc\">\n        <thead>\n        <tr>\n\t\t\t\t\t\t<th scope=\"col\">Lot<\/th><th scope=\"col\">SPE<\/th><th scope=\"col\">Amount Paid (in R$ mn)<\/th><th scope=\"col\">RAP (2021-22 cycle) R$ MM<\/th><th scope=\"col\">Acquired Stake<\/th><th scope=\"col\">TAESA Final Stake<\/th><th scope=\"col\">Accounting Method for TAESA<\/th>        <\/tr>\n        <\/thead>\n        <tbody>\n        <tr class=\"separator\">\n            <td colspan=\"8\"><\/td>\n        <\/tr>\n\t\t<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#segundatab\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t\t<th id=\"segundatab-0\" class=\"segundatab-row col-th-0\">L<\/th><th id=\"segundatab-1\" class=\"segundatab-row col-th-1\">Brasnorte Transmissora de Energia S.A. (Brasnorte)<\/th><th id=\"segundatab-2\" class=\"segundatab-row col-th-2\">75.622<\/th><th id=\"segundatab-3\" class=\"segundatab-row col-th-3\">30.8<\/th><th id=\"segundatab-4\" class=\"segundatab-row col-th-4\">49.7115%<\/th><th id=\"segundatab-5\" class=\"segundatab-row col-th-5\">88.376%<\/th><th id=\"segundatab-6\" class=\"segundatab-row col-th-6\">Consolidation<\/th><\/tr>\n<tr class=\"separator\">\n    <td colspan=\"8\"><\/td>\n<\/tr>\n\n<br \/>\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t\t<th id=\"-0\" class=\"-row col-th-0\">M<\/th><th id=\"-1\" class=\"-row col-th-1\">Companhia Transirap\u00e9 de Transmiss\u00e3o (Transirap\u00e9)<\/th><th id=\"-2\" class=\"-row col-th-2\">34.969<\/th><th id=\"-3\" class=\"-row col-th-3\">29.4<\/th><th id=\"-4\" class=\"-row col-th-4\">24.50%<\/th><th id=\"-5\" class=\"-row col-th-5\">53.9982%\u00b2<\/th><th id=\"-6\" class=\"-row col-th-6\">Equity Method<\/th><\/tr>\n<tr class=\"separator\">\n    <td colspan=\"8\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t\t<th id=\"-0\" class=\"-row col-th-0\">M<\/th><th id=\"-1\" class=\"-row col-th-1\">Companhia Transleste de Transmiss\u00e3o (Transleste)<\/th><th id=\"-2\" class=\"-row col-th-2\">24.199<\/th><th id=\"-3\" class=\"-row col-th-3\">18.0<\/th><th id=\"-4\" class=\"-row col-th-4\">24.00%<\/th><th id=\"-5\" class=\"-row col-th-5\">53.9982%\u00b2<\/th><th id=\"-6\" class=\"-row col-th-6\">Equity Method<\/th><\/tr>\n<tr class=\"separator\">\n    <td colspan=\"8\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t\t<th id=\"-0\" class=\"-row col-th-0\">M<\/th><th id=\"-1\" class=\"-row col-th-1\">Companhia Transudeste de Transmiss\u00e3o (Transudeste)<\/th><th id=\"-2\" class=\"-row col-th-2\">18.340<\/th><th id=\"-3\" class=\"-row col-th-3\">18.4<\/th><th id=\"-4\" class=\"-row col-th-4\">25.00%<\/th><th id=\"-5\" class=\"-row col-th-5\">53.9982%\u00b2<\/th><th id=\"-6\" class=\"-row col-th-6\">Equity Method<\/th><\/tr>\n<tr class=\"separator\">\n    <td colspan=\"8\"><\/td>\n<\/tr>\n\n<tr class=\"acc-table-header collapsed\" role=\"button\" data-toggle=\"collapse\" data-target=\"#\" aria-expanded=\"false\" aria-controls=\"collapseOne\">\n\t\t<th id=\"-0\" class=\"-row col-th-0\">N<\/th><th id=\"-1\" class=\"-row col-th-1\">Empresa de Transmiss\u00e3o do Alto Uruguai S.A. (ETAU)<\/th><th id=\"-2\" class=\"-row col-th-2\">32.880<\/th><th id=\"-3\" class=\"-row col-th-3\">39.1<\/th><th id=\"-4\" class=\"-row col-th-4\">23.0355%<\/th><th id=\"-5\" class=\"-row col-th-5\">75.6193%<\/th><th id=\"-6\" class=\"-row col-th-6\">Equity Method<\/th><\/tr>\n<tr class=\"separator\">\n    <td colspan=\"8\"><\/td>\n<\/tr>\n\n        <\/tbody>\n    <\/table>\n<\/div>\n[vc_column_text css=&#8221;.vc_custom_1601472061518{margin-top: -16px !important;margin-bottom: 20px !important;padding-top: 20px !important;padding-right: 20px !important;padding-bottom: 20px !important;padding-left: 20px !important;background-color: #e3eaef !important;}&#8221;]<\/p>\n<h6>(1) RAP related to the acquired stake (2020-2021 cycle).<br \/>\n(2) Considers direct interest of 49% and indirect interest of 4.9982% via subsidiary ENTE.<\/h6>\n<p>[\/vc_column_text][vc_column_text css=&#8221;.vc_custom_1568900446216{margin-bottom: 30px !important;}&#8221;]On August 30, 2019, the Company disclosed a <a href=\"https:\/\/ri.taesa.com.br\/wp-content\/uploads\/2019\/09\/20190913-Aviso-Debenturistas-Juros-1-e-2-S%C3%A9ries-4-emiss%C3%A3o-ingl%C3%AAs-1.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Material Fact<\/a> that the Company&#8217;s Extraordinary General Meeting approved, on this date, the acquisition by the Company of 11.624% of the shares representing the total and voting capital of Brasnorte Transmissora de Energia S.A. (\u201cBrasnorte\u201d), through the settlement of the Share Purchase Agreement with Bipar Energia, Telecomunica\u00e7\u00e3o e Industria Metal\u00fargica S.A. (\u201cBipar\u201d), for the amount of R$ 17,654,000.00, subject to the adjustments provided in the Agreement. Also on this date, the Agreement with Bipar was signed, and the Acquisition was concluded through the payment of R$ 18,023,923.47, after the proper adjustments.<\/p>\n<p>After the conclusion of this operation, the Company, which previously held 88.376% of shareholding interest in Brasnorte, now holds 100% of Brasnorte&#8217;s total shares.[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div><span class=\"et_bloom_bottom_trigger\"><\/span>","protected":false},"excerpt":{"rendered":"<p>[vc_row css=&#8221;.vc_custom_1548956217993{margin-bottom: 20px !important;}&#8221; el_id=&#8221;nomobile&#8221;][vc_column offset=&#8221;vc_hidden-sm vc_hidden-xs&#8221;][\/vc_column][\/vc_row][vc_row css=&#8221;.vc_custom_1558980062558{margin-bottom: 20px !important;}&#8221;][vc_column][vc_column_text css=&#8221;&#8221;] Greenfield The Company currently has four projects under implementation with a total ANEEL investment of R$ 4.3 billion and an RAP of R$ 490.7 MM (RAP cycle 2025-2026) \u2013 part of this RAP is already in operation (R$ 137.5 MM of Sa\u00edra) \u2013 and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":40969,"parent":1417,"menu_order":4,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-6577","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/ri.taesa.com.br\/en\/wp-json\/wp\/v2\/pages\/6577","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ri.taesa.com.br\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ri.taesa.com.br\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ri.taesa.com.br\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ri.taesa.com.br\/en\/wp-json\/wp\/v2\/comments?post=6577"}],"version-history":[{"count":53,"href":"https:\/\/ri.taesa.com.br\/en\/wp-json\/wp\/v2\/pages\/6577\/revisions"}],"predecessor-version":[{"id":297707,"href":"https:\/\/ri.taesa.com.br\/en\/wp-json\/wp\/v2\/pages\/6577\/revisions\/297707"}],"up":[{"embeddable":true,"href":"https:\/\/ri.taesa.com.br\/en\/wp-json\/wp\/v2\/pages\/1417"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ri.taesa.com.br\/en\/wp-json\/wp\/v2\/media\/40969"}],"wp:attachment":[{"href":"https:\/\/ri.taesa.com.br\/en\/wp-json\/wp\/v2\/media?parent=6577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}